- Site clearance: This involves removing any existing vegetation, buildings, or structures from the site.
- Footing and foundation installation: This involves digging holes for the building’s footings and foundations, and then pouring concrete into these holes to create a solid base for the building.
- Drainage installation: This involves installing underground pipes to collect and dispose of rainwater and wastewater.
- Landscaping: This involves grading the ground, planting trees and shrubs, and laying sod or other
- Excavation: Excavating trenches, pits, and other areas for footings, foundations, and drainage systems.
- Backfilling and compaction: Backfilling trenches and pits with soil, and compacting the soil to ensure it is stable.
- Formwork construction: Erecting formwork to support the concrete for foundations, footings, and other structures.
- Reinforcing steel placement: Placing reinforcing steel rods in the formwork to strengthen concrete structures.
- Concrete placement: Pouring concrete into the formwork, and ensuring that the concrete is properly consolidated and cured.
- Drainage system installation: Laying pipes and ducts for underground drainage systems, and connecting them to the main sewer system or septic tank.
- Utility installation: Laying pipes and ducts for electricity, data, and other utilities, and connecting them to the building’s electrical panel, data outlets, and other equipment.
- Grading and landscaping: Grading the ground to ensure that it is level and sloped properly, and planting trees, shrubs, and landscaping materials.
- Cleaning up the site: Removing all of the construction debris and preparing the site for the next phase of construction.
- landscaping materials.